Improvements

2019:

Entire sewer/waste plumbing system replaced (above the basement-level not replaced) 
Sewer/waste pipe between basement and sewer replaced 
New water heater, 40 gallons, natural gas 
New sump pump 


2018: 

New electrical panel 


2017: 

Foundation repaired
ADA-accessible shower, transfer type 


2015: 

New kitchen cabinets, countertop, sink, and garbage disposal 


2010: 

Central Air Conditioning 

2006: 

High-Efficiency gas furnace