2019:
Entire sewer/waste plumbing system replaced (above the basement-level not replaced)
Sewer/waste pipe between basement and sewer replaced
New water heater, 40 gallons, natural gas
New sump pump
2018:
New electrical panel
2017:
Foundation repaired
ADA-accessible shower, transfer type
2015:
New kitchen cabinets, countertop, sink, and garbage disposal
2010:
Central Air Conditioning
2006:
High-Efficiency gas furnace